Home

Contact


Design

Specialty Engineering

Constructability Reviews

CPM Project Schedules

Cost Estimates

Claims, Expert Testimony
and Reports


Miscellaneous
 

CPM Project Schedules

Services / CPM Project Schedules

CECís schedulers not only know the software, they know the work. Good Critical Path Method (CPM) scheduling and delay analysis means knowing the activities required, their sequence and the time it takes to perform them. CEC uses the latest version of Primavera software by Oracle to construct schedules with resource and cost loading as the client may require. We specialize in baseline schedules and schedules for design-build RFPís. CEC assists owners with contract time analyses and reviews of contractorís monthly schedule updates.


Port Boulevard Reconstruction, Port of Miami

SW 87th Avenue Extension, Miami-Dade County

Copans Road from Turnpike to Powerline Road

US-1 Bus Lanes, Miami-Dade County

Access Road to Florida Panther Arena from the Sawgrass Expressway

Toll Plaza Renovations on Sawgrass Expressway, Design-Build

Fort Lauderdale Executive Airport Taxiway

Royal Park Tree Relocation, Design-Build

Pine Crest School Central Energy Plant

Various Sound Barrier Walls throughout Florida

Copyright ©2009 Construction Engineering Consultants. All rights reserved.
Home Page | About us | Projects | Services | Contact